Northeast Power Coordinating Council - Cross Border Regional Entity Home Robert Moses Hydro Electric Dam courtesy of New York Power Authority Raddison Substation courtesy of TransEnergie HydroQuebec NY Skyline courtesy of ConEd

NPCC Inc. Guidelines (or Guides), designated as Type "B" documents and identified as NPCC Inc. Document B-nn, serve as the guide through which implementation of the criteria and acceptable system performance is achieved. The establishment of a guideline, or the revision to an existing guideline, requires the approval of the Reliability Coordinating Committee.

Start Date:         End Date:        

Guides

DocumentPosted
B-07 Automatic Underfrequency Load Shedding Program Relaying Guideline 09/04/2008
B-21 Guide for Analysis and Reporting of Protection System Misoperations 09/04/2008
B-04 Guidelines for NPCC AREA Transmission Reviews 03/07/2008
B-12 Guidelines for On-Line Computer System Performance During Disturbances 11/08/2007
B-09 Guide for Rating Generating Capability--Replaced by A-13 Document on July 18, 2007 07/18/2007
B-03 Guidelines for Inter-AREA Voltage Control (replaced by C-40) 04/26/2007
B-05 Bulk Power System Protection Guide 03/14/2007
B-25 Guide to Time Synchronization of Substation Equipment 11/30/2006
B-26 Guide for Application of Disturbance Recording Equipment 10/02/2006
B-10 Guidelines for Requesting Exclusions to Sections 5.1(B) and 6.1(B) of the NPCC Basic Criteria for Design and Operation of Interconnected Power Systems 08/02/2006
B-08 Guidelines for Area Review of Resource Adequacy 11/29/2005
B-22 Guidelines for Implementation of the NPCC Compliance Program 06/01/2005
B-01 Guide for the Application of Autoreclosing to the Bulk Power System 03/09/2005
B-24 Security Guidelines for Protection System IEDS 07/14/2004
B-11 Guideline B-11 was changed to Criteria A-11 11/14/2002
B-02 Control Performance Guide 03/02/1999
B-06 Document B-6 was incorporated into Document B-7 03/02/1999