| I.D. | Title | Closing Date | Document | Comments | Response |
| C-45 | CO-12 Seasonal Assessment Methodology | 11/17/2008 |
Doc
|
|
None
|
| A-6 | Operating Reserve Criteria | 11/13/2008 |
Doc
|
|
None
|
| Directory 9 | Verification of Generator Gross and Net Real Power Capability | 10/03/2008 |
Doc
|
|
None
|
| Directory 10 | Verification of Generator Gross and Net Reactive Power Capability | 10/03/2008 |
Doc
|
|
None
|
| B-8 | Guidelines for Area Review of Resource Adequacy | 09/01/2008 |
Doc
|
|
None
|
| B-27 | Regional Critical Asset Identification Methodology | 08/24/2008 |
Doc
|
|
None
|
| A-7 | Revise Critical Component Definition | 08/11/2008 |
Doc
|
|
None
|
| Dir 8 | System Restoration | 08/11/2008 |
Doc
|
|
View
|
| C-13 | Operational Planning Coordination | 08/10/2008 |
Doc
|
|
None
|
| C-42 | Procedure for Reporting and Reviewing System Disturbances | 08/09/2008 |
Doc
|
|
None
|
| C-37 | Operating Procedures for ACE Diversity Interchange (ADI) | 08/08/2008 |
Doc
Clean
|
|
View
|
| C-38 | Procedure for Operating Reserve Assistance | 08/08/2008 |
Doc
Clean
|
|
None
|
| Document B-07 | Automatic Underfrequency Load Shedding Program | 07/08/2008 |
Doc
|
|
None
|
| B-21 | NPCC Guide for Analysis and Reporting of Protection System Misoperations, Document B-21 | 07/08/2008 |
Doc
|
|
None
|
| B-27 | Regional Critical Asset Identification Methodology | 05/06/2008 |
Doc
|
|
View
|
| D-02 | NPCC Regional Reliability Directory #2 Emergency Operations | 04/11/2008 |
Doc
|
|
View
|
| C-43 | NPCC Operational Review for the Integration of New Facilities | 03/13/2008 |
Doc
|
|
View
|
| A-12 | System Restoration Criteria | 02/29/2008 |
Doc
|
|
None
|
| NPCC Directory 7 SPS | Directory 7 Special Protection Systems and Directory Workplan | 10/06/2007 |
Doc
|
|
None
|
| C-17 | Procedures for Monitoring and Reporting Critical Operating Tool Failures | 08/06/2007 |
Doc
|
|
None
|